Asbestos Testing and Surveys in Los Angeles

Typical cost in Los Angeles

  • Testing for a small remodel, a few samples$400 – $800+
  • Whole-house survey before a remodel or demolition$600 – $1,500+
  • Air test after removal (clearance)$400 – $1,000+

A lab test shows whether a ceiling texture, a floor layer or a wall material contains asbestos. We arrange the sampling so your plans, your permit and your bids all start from the same written report.

The South Coast Air Quality Management District’s Rule 1403 calls for that survey prior to any demolition or renovation activity. A Cal/OSHA-certified asbestos consultant or technician with EPA Building Inspector training does the sampling.

Request a free quote
Carpeted stairs with wood railings, orange tape marking small sample spots on the ceiling and wall, with bags and papers on the bottom step and floor

What testing covers

Samples for a remodel

The rooms your plans will open are sampled first, from ceiling texture to wall surfaces and the floor layers under them. The survey reaches all layers of flooring down to the joists and material in the wall or ceiling cavities as needed.

Survey before a teardown

Every demolition needs a district notice, whether or not any asbestos is found. The survey tells the crew what has to come out before the building does.

The lab report

The report lists what was sampled, where, and the result. It speaks only for those samples, so a change of plan or an area nobody sampled can mean more testing.

Small jobs in single-unit houses

The survey requirement does not apply to renovation of a residential single-unit dwelling in which less than 100 square feet of surface area of asbestos-containing material is removed or stripped. It never covers demolition, condos, townhouses or apartments, and testing is still how you know the amount.

Who samples and who reports

Cal/OSHA allows only a certified asbestos consultant to provide asbestos consulting, and it requires certification for consultants and technicians who sample or oversee removal projects of 100 square feet or more.

The worker-protection line

Cal/OSHA treats material with more than 1/10th of 1% asbestos by weight as asbestos-containing construction material. That is a lower line than the 1 percent the district uses in its floor covering definition.

Air testing afterward

Clearance air testing after removal is a separate job for an independent consultant, never for the crew that did the removal.

Planning a bigger job? See floor tile and mastic removal, or go back to the home page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (747) 346-0392

Call (747) 346-0392