Duct wrap and seam tape
The outer wrap, the tape at each seam and any insulation under it are sampled as separate materials before the duct is cut or lowered.
Typical cost in Los Angeles
Wrap, tape and insulation on ducts and pipes are sampled before a heating or cooling system is replaced or moved.
Rule 1403 counts installing or removing heating, ventilation and air conditioning systems as renovation, so a system change-out falls under the same survey and notice steps as any other project.

The outer wrap, the tape at each seam and any insulation under it are sampled as separate materials before the duct is cut or lowered.
Wrap on hot and cold water lines is sampled before a repipe or a remodel opens the wall or ceiling it runs through.
Ducts run through attics and hall closets with loose insulation beside them. The sample plan covers the wrap and the material around it.
A new unit means the old one and its duct connections come out. That counts as HVAC removal under the rule, so the survey and notice come first.
Heating and cooling equipment stays with your licensed HVAC contractor, and we plan the asbestos work around theirs.
Sampling comes first and removal second. Your HVAC contractor starts after the area is finished.
A job that needs the system off calls for a shut-off time agreed in advance by your HVAC contractor and us, before the work area goes up.
Attics, closets and tight spaces decide how the work area is built, so tell us what the crew will have to reach.

Samples come before any duct is cut, so see asbestos testing, or visit the home page for the full list.