Joint compound and seams
The compound that covers drywall seams and screw heads is sampled separately from the board, because it is a different material.
Typical cost in Los Angeles
Walls and ceilings are tested one layer at a time, including the board, the joint compound over its seams and any plaster or skim coat on top.
The survey also reaches material inside wall and ceiling cavities as needed, so we plan where a wall opens before anyone cuts into it.

The compound that covers drywall seams and screw heads is sampled separately from the board, because it is a different material.
Older houses can have plaster over wood lath, with a base coat and a finish coat. Each coat is part of the sample plan.
A skim coat or an old repair patch can be a different material from the wall it covers, so the sample plan lists each one separately.
A small opening for a pipe or a cable is still renovation. The sample plan covers the wall surface and what is behind it.
Nobody can see everything a wall holds until it is opened, which is why the survey plan comes first.
Rule 1403 sends the survey into wall and ceiling cavities as necessary to identify and sample what is there.
New board, mud, texture and paint come after removal and belong to other trades, so schedule them for the days that follow.

A wall plan starts with testing, and bigger jobs sit under renovation and demolition abatement. The home page lists the rest.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (747) 346-0392