Example Asbestos Removal Projects in Los Angeles

Below are seven example jobs in Los Angeles, Glendale and Burbank, from a bathroom remodel to an office suite. For each one you can see what the consultant sampled, what came out, how many work days it took and an estimated cost.

Floor and wall material cleared before a Spanish Revival bathroom remodel

Example project

Home
1920s Spanish Revival house in Los Angeles with a single bathroom and a 1960s update to the floor and tub wall
Original request
Replace the tub with a walk-in shower and lay a new floor, under a building permit from LADBS
Testing
A Cal/OSHA-certified asbestos consultant samples the floor vinyl and its backing, the wall skim coat behind the tub, the sink wall texture and the ceiling
Found
Asbestos in the sheet vinyl with its backing and in the skim coat behind the tub
Clear
The sink wall texture and the ceiling
Area
About 135 sq ft, 45 of floor and 90 of wall
Timeline
Notice no later than 10 working days ahead, then three working days
Cost
$4,100

Scope of work

The price covers removal of the vinyl, its backing and the skim coat, the bathroom sealed in plastic with air filters running, wet removal into labeled bags and a haul with its paperwork. The survey, the district notification fee, the clearance air test and the new shower and floor are separate.

Project overview

In this example, a couple in a 1920s Spanish Revival house wants a walk-in shower where the old tub sits. For this permit LADBS counts a remodel like a demolition, so it releases the permit only with evidence that the Rule 1403 notice was filed or a signed statement that notification does not apply.

The vinyl and the wall skim coat test positive, so notification applies. The abatement contractor files the notice online and the couple hands the evidence in at the permit counter. The abatement crew removes the two materials before the plumber opens the wall.

The goal

The goal is a bare bathroom with no positive floor or wall material left, so the shower goes in and the permit papers are complete.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the floor, the tub wall, the sink wall and the ceiling.
  2. Before work The contractor files the district notice online, and the notice evidence goes in with the LADBS permit papers.
  3. Days one to three The bathroom is sealed, the skim coat and the vinyl come off wet, and the bags leave with a hauler.
  4. Last An independent consultant tests the air, then the plumber starts on the shower.

Planning right

  • Ask the consultant to mark every sample spot on a plan of the bathroom.
  • Keep the notice evidence with the permit papers.
  • Walls that tested clear can come down with the tub on demo day.
  • Book the tile setter for after the air test.

Get a free quoteMore about renovation and demolition abatement

Living room ceiling texture removed in a courtyard apartment between tenants

Example project

Building
1960s courtyard apartment building in Los Angeles with 14 units around a shared walkway
Original request
Smooth the living room and hall ceilings of one vacant unit before it is rented again
Testing
A Cal/OSHA-certified asbestos consultant samples the ceiling texture in the living room, the hall and the bedroom
Found
Asbestos in the living room and hall texture
Clear
The bedroom ceiling
Area
About 220 sq ft of ceiling
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$2,900

Scope of work

Three texture samples, the district notice filed by the contractor, the unit closed in plastic with its own air filter, the texture wetted and scraped into sealed bags, a HEPA clean and the haul. The clearance air test and the new finish are separate.

Project overview

In this example, the owner of a 1960s courtyard building has a one-bedroom unit empty for two weeks and wants smooth ceilings in the main rooms before the next lease. An apartment is never a single-unit dwelling, so the survey comes first even though the room is small.

The living room and hall texture test positive and the bedroom is clear. The abatement crew treats those two ceilings as one job, sealed off from the walkway and the adjoining unit.

The goal

The goal is two bare ceilings, so the unit can be skimmed and painted for its next tenant.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant takes three texture samples while the unit is empty.
  2. Before work The contractor files the district notice online, and a note goes to the neighbors about work hours.
  3. Day one The doorway and vents are sealed and the texture is wetted and scraped.
  4. Day two A wipe-down, bagging and the haul, then an independent consultant takes the air samples.

Planning right

  • Empty the unit completely before the survey.
  • Tell the neighbors which two days the crew will be in the building.
  • Skim and paint only after the air results are in.
  • Keep the lab report with the building file.

Get a free quoteMore about popcorn ceiling removal

Sprayed fireproofing taken off a beam before a downtown suite gets a new ceiling

Example project

Building
1960s steel-frame office building downtown, with a 1,200 sq ft suite on a middle floor
Original request
Hang a new conference room ceiling and a sprinkler branch from the steel above the suite
Testing
A Cal/OSHA-certified asbestos consultant samples the sprayed coating on the beam and deck, the ceiling tile and the floor mastic
Found
Asbestos in the sprayed fireproofing on the beam and the deck above it
Clear
The ceiling tile and the floor mastic
Area
About 300 sq ft of beam and deck
Timeline
Notice no later than 10 working days ahead, a building permit with an approved plan, then four evenings
Cost
$9,800

Scope of work

A sealed work area around the beam line, the district notice, wet removal of the coating into labeled bags, air monitoring each evening and the haul with its paperwork. The survey, the building permit, the new fireproofing and the ceiling work are separate.

Project overview

In this example, a design firm leasing a suite in a 1960s office tower wants a conference room with a hung ceiling. The hangers and a sprinkler branch will attach to the steel above, which is coated with sprayed fireproofing. Taking it off alters the fire protection of that steel, and for that LADBS asks for a building permit and an approved plan.

The coating tests positive. The abatement crew works in the evenings so the other tenants are not disturbed, and a separate fireproofing contractor reapplies the coating once the new hangers are in.

The goal

The goal is a clean beam line, so the hangers go in and the fireproofing is put back to the approved plan.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the beam, the deck, the ceiling tile and the floor.
  2. Before work The district notice is filed online, and the building permit and plan are approved.
  3. Evenings one to four The beam line is sealed and the coating is wetted and taken off, with air monitoring each night.
  4. Last An independent lab tests the air, then the fireproofing and ceiling crews start.

Planning right

  • Ask the building manager about after-hours access early.
  • Mark every hanger and sprinkler location on the plan before the survey.
  • Have the new fireproofing scheduled to follow the last air test.
  • Keep the report and the notice with the lease file.

Get a free quoteMore about apartments, condos and commercial suites

Garage wall finish removed before a garage becomes a backyard unit

Example project

Home
1950s ranch house in Burbank with an attached one-car garage at the side
Original request
Turn the garage into a small backyard unit with insulated walls and a bathroom
Testing
A Cal/OSHA-certified asbestos consultant samples the garage wall seams and texture on three walls and the ceiling
Found
Asbestos in the joint compound and wall texture
Clear
The garage ceiling
Area
About 400 sq ft of wall
Timeline
Notice no later than 10 working days ahead, then three working days
Cost
$4,600

Scope of work

A sealed garage with air filters running, the wall surface wetted and removed down to the studs, bagging, a HEPA clean and the haul with its paperwork. The survey, the clearance air test, new insulation and drywall are separate.

Project overview

In this example, a family in Burbank wants a backyard unit for a parent and plans to convert the garage next to the house. The framers will open the walls to add insulation and plumbing for the bathroom.

The seams and texture on the three exterior walls test positive. The abatement crew strips them back to the studs before any framing starts, so nothing positive is cut up in the middle of the build.

The goal

The goal is bare studs with no positive finish left, so framing and insulation can start clean.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the wall seams, the texture and the ceiling.
  2. Before work The contractor files the district notice online while the plans go to the building department.
  3. Days one to three The garage is sealed, the wall surface comes off wet and the bags go out to the hauler.
  4. Last An independent consultant tests the air and the framers move in.

Planning right

  • Park cars and clear the garage shelves a day early.
  • Ask the framers to wait for the air results.
  • Keep the lab report with the permit set.
  • Wall pieces from the clear ceiling can be removed with the framing work.

Get a free quoteMore about drywall, joint compound and plaster removal

Kitchen samples that all come back clear before a refresh, with a permit declaration

Example project

Home
1950s house in Los Angeles with the original kitchen layout and a newer floor
Original request
New cabinets, a new floor and fresh paint, with a building permit from LADBS
Testing
A Cal/OSHA-certified asbestos consultant takes five samples: the floor vinyl, the wall texture, the ceiling texture, the seam compound behind the range and the window putty
Found
No asbestos in any of the five samples
Clear
The floor vinyl, wall and ceiling texture, seam compound and window putty
Timeline
A visit of about an hour, results within a few days
Estimated testing cost
$500

Scope of work

A visit by the consultant, five samples taken where the cabinets, floor and walls will be touched, a lab result for each and a short report with the sample spots marked. If anything had tested positive, its removal would be priced separately.

Project overview

In this example, a couple in Los Angeles is refreshing the kitchen of their 1950s house with new cabinets and a new floor. Because LADBS counts a remodel like a demolition for this permit step, the permit comes with either evidence that a Rule 1403 notice was filed or a signed statement that notification does not apply.

Five samples cover every surface the crew will touch, and all five return clear. With nothing to remove, the owners sign the statement that notification does not apply and keep the report with the permit papers.

The goal

The goal is a kitchen refresh that starts on schedule, with the results on file and nothing to remove.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the floor, walls, ceiling, seams and window putty.
  2. A few days later The lab results come back clear for all five samples.
  3. Next The owners sign the not-applicable statement on the permit application.
  4. Then The cabinet and floor crews start on the date they booked.

Planning right

  • Ask the consultant to sample every surface the new cabinets and floor will disturb.
  • Keep the report with the permit papers.
  • A clear result covers only the spots that were sampled.
  • Book the crews after the results arrive.

Get a free quoteMore about asbestos testing and surveys

Pipe wrap taken down in a condo lobby closet before the board replaces the lobby flooring

Example project

Building
1970s condominium building in Los Angeles with 36 units and a ground-floor lobby
Original request
The board is replacing the lobby flooring and wants the pipe closet beside it in order first
Testing
A Cal/OSHA-certified asbestos consultant samples the lobby floor tile, the pipe wrap and the closet walls
Found
Asbestos in the wrap on the hot-water pipes
Clear
The lobby floor tile and the closet walls
Area
About 40 ft of pipe wrap and fittings
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$1,900

Scope of work

The closet sealed with the door side taped into the lobby, the wrap and fittings removed wet into labeled bags, a cleanup and the haul. The survey, the clearance air test and new pipe insulation are separate.

Project overview

In this example, the board of a 1970s condominium has approved new lobby flooring. The pipe closet opens onto the lobby, and the flooring crew will be working a few steps from it for several days. A condo is never a single-unit dwelling, so the survey covers the whole job, closet included.

The lobby tile tests clear and the wrap on the hot-water pipes tests positive. The abatement crew removes the wrap first and seals the lobby side of the closet while it works.

The goal

The goal is bare pipes in the closet, so the lobby flooring goes in with nothing positive nearby.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the lobby tile, the pipe wrap and the closet walls.
  2. Before work The contractor files the district notice online, and the board posts a notice for residents.
  3. Days one and two The closet is sealed, the wrap is wetted and removed and the fittings are cleaned.
  4. Last An independent consultant tests the air and the flooring crew starts.

Planning right

  • Post the work dates in the lobby for residents.
  • Ask the flooring contractor to start only after the air test.
  • Keep the report in the association records.
  • Have a plumber ready to rewrap the pipes with new insulation.

Get a free quoteMore about HVAC duct and pipe insulation removal

Duplex kitchen floor sampled down to the joists, then the old tile lifted

Example project

Building
1940s duplex in Glendale, one unit with a kitchen floor that has been covered twice
Original request
A new kitchen floor for the downstairs unit
Testing
A Cal/OSHA-certified asbestos consultant takes samples of each layer from the top vinyl to the subfloor, and of the wall texture beside the sink
Found
Asbestos in the 9-inch tile and its black mastic, the layer under the top vinyl
Clear
The top vinyl, the plywood layer and the wall texture
Area
About 230 sq ft of kitchen floor
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$3,400

Scope of work

Lab results for each flooring layer, the district notice, the kitchen sealed in plastic, the top vinyl and plywood lifted, the tile and mastic taken up wet down to the joists, bagging and a cleanup. The new floor and the clearance air test are separate.

Project overview

In this example, the owner of a Glendale duplex wants a new floor in the kitchen of the downstairs unit. A duplex has two units, so the single-unit shortcut never applies and the survey must reach every layer down to the joists.

The consultant finds 9-inch tile and black mastic under the top vinyl and plywood. The abatement crew removes all three layers and leaves bare joists, so the new floor is laid on clean framing.

The goal

The goal is bare joists in the kitchen, so the new floor sits on clean framing.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant opens a window through the layers and samples each one.
  2. Before work The abatement contractor files the district notice online.
  3. Day one The kitchen is sealed, the vinyl and plywood come up, then the tile is lifted by hand.
  4. Day two The mastic is taken up wet, the joists are cleaned and the bags are hauled out.

Planning right

  • Ask the consultant to show the layers before they are patched.
  • Move the tenant upstairs out of the way of the work area.
  • Book the new floor after the air test.
  • Keep the report with the building records.

Get a free quoteMore about floor tile and mastic removal